Costs

How much does it cost to build a house in northern Portugal in 2026?

As a market reference, a house with a standard finish costs 1,400⁠–⁠1,800 €/⁠m² in northern Portugal.

At ASSA, a new turnkey house costs 1,800⁠–⁠2,100 €/⁠m² on average S‑4.

Construction only: without land, projects, licences or VAT.

Price per m² by finish

Market reference for northern Portugal, 2026. Construction only, without land, projects, licences or VAT. Sources: Santander, Habitissimo.

  • Essential1,100⁠–⁠1,400 €/⁠m²
  • Standard1,400⁠–⁠1,800 €/⁠m²
  • Premium S-41,800⁠–⁠2,400 €/⁠m²

ASSA average, new turnkey house: 1,800⁠–⁠2,100 €/⁠m² S‑4. The bands above are a market reference.

Market reference in June 2026, construction only: essential 1,100⁠–⁠1,400 €/⁠m²; standard 1,400⁠–⁠1,800 €/⁠m²; premium 1,800⁠–⁠2,400 €/⁠m². Santander gives 950⁠–⁠1,500 €/⁠m² for traditional construction; Habitissimo gives 1,400⁠–⁠1,800 €/⁠m² for Porto. The premium band is an internal estimate still to be confirmed S‑4.

Calculate here

Finish

Market reference. Construction only.

€ 210,000 – € 270,000

construction only, without VAT, land, projects or licences

Three examples

Three examplesEssentialStandardPremium
T2 · 100 m² · 1 storey€ 110,000 – € 140,000€ 140,000 – € 180,000€ 180,000 – € 240,000
T3 · 150 m²€ 165,000 – € 210,000€ 210,000 – € 270,000€ 270,000 – € 360,000
T4 · 200 m² · 2 storeys€ 220,000 – € 280,000€ 280,000 – € 360,000€ 360,000 – € 480,000

Rounded to €5,000. Market reference, construction only. construction only, without VAT, land, projects or licences

What the price per m² leaves out

  • Land
  • Architecture and specialty projects up to about €7,000 for a simple house (Santander)
  • Câmara fees
  • Water, power and sewage connections
  • VAT may be 6% on a construction contract for your own permanent home, if the contract meets the legal conditions (item 2.42.1 of List I of the CIVA)

According to Santander, land can be up to 15% of the total.

What raises the cost

  • Slope retaining walls and more earthworks.
  • Basement excavation, waterproofing, retaining structures.
  • Rock granite near the surface makes excavation dearer.
  • Access narrow streets limit machines and deliveries.
  • Finishes the biggest difference between bands.

Garage, basement and pool are quoted separately.

With 150 or 200 thousand euros, what you can build

It depends on area and finish. The market reference covers construction only, without land, projects or licences.

€150,000

Essential
With €150,000 for construction, the Essential band corresponds to about 105 m².
Standard
With €150,000 for construction, the Standard band corresponds to about 80 m².
Premium
With €150,000 for construction, the Premium band corresponds to about 60 m².

€200,000

Essential
With €200,000 for construction, the Essential band corresponds to about 140 m².
Standard
With €200,000 for construction, the Standard band corresponds to about 110 m².
Premium
With €200,000 for construction, the Premium band corresponds to about 80 m².

construction only, without VAT, land, projects or licences

Sources

  1. Santander: cost per square metre to build a house
  2. Santander: how much it costs to build a house
  3. Habitissimo: turnkey house construction
  4. idealista: 6% VAT on construction, the full guide (in Portuguese)
  5. APCMC: licence classes
  6. Deloitte: urban Simplex 2026
  7. Moneylab: pros and cons of construction credit

Let’s start with your plot

Where are you now?

Tell us where you are, and we will tell you the next step.

Free, no obligation. S‑13

After your request, Sergii calls you within S‑5 · N working hours.

Drawing of a 28 by 20 metre plot with the house footprint